3-20. RFI/EMI Components.
This task covers:
Replace
INITIAL SETUP
Materials/Parts
Washer, PN SM-B-374181
Replace. RFI/EMI component replacement is Iimited to replacement of the EMI washer (para 3-19).
Section IV. PREPARATION FOR SHIPMENT AND STORAGE
Subject
Para
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21
Loading Shelter into ANSI/ISO Container . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22
General Storage Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
Administrative Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-24
Page
3-35
3-35
3-35
3-35
3-21. General. No special preparation is required for shipment of the shelter other than making sure the
correct sling assembly is available and in good condition, the skids are in good condition and securely mounted to
the shelter, and the drain plug is loosened for air or rail transport.
3-22. Loading Shelter into ANSI/ISO Container. Shelters maybe shipped in Type IAA ANSI/ISO
containers only when crated or pallet-mounted. Block crates or pallets securely in the container to prevent
movement and damage during transit. Install and remove shelters in accordance with TB 11-5400-200-14.
3-23. General Storage Requirements. Accumulation of moisture within the shelter resulting from
temperature and humidity fluctuations can damage equipment. Minimize moisture accumulation by keeping
shelter doors, louver covers and drain holes open during indoor storage. During outdoor storage, keep doors and
drain holes closed, but keep louver covers open. A free breather assembly may also be used, when available, to
absorb moisture inside the shelter. When using the free breather assembly, doors, louver covers and drain holes
must be closed. For usage information, refer to the applicable drawing for the particular free breather assembly
being used.
3-24. Administrative Storage.
a. Placement of equipment in administrative storage should be for short periods of time when a shortage of
maintenance effort exists. Items should be in mission readiness within 24 hours or within the time factors as
determined by the directing authority. During the storage period appropriate maintenance records will be kept.
b. Before placing equipment in administrative storage, current maintenance services and equipment
serviceable criteria (ESC) evaluations should be completed, shortcomings and deficiencies should be corrected,
and all modification work orders (MWOs) should be applied.
c. Storage site selection. Inside storage is preferred for items selected for administrative storage.